Grade A Rebuilds 2500 psi
(3000psi option available at extra cost)
The following is the agenda for a Grade A rebuild:
- Strip to Bare Shell.
- Prepare to Shot Blast.
- Shot Blast (Appropriate Parts).
- Inspect:
- a) Foundation Plate Latch Plate.
- b) Head.
- c) 9" Ram.
- Replace or Rectify if Necessary.
- Fit New Front Barrel.
- Assemble Parts Together for First Spray.
- First Spray Where Required.
- Recondition 15 Hp Motor (Rewind if Necessary).
- Recondition Cutter Motor when Required (Rewind if Necessary).
- Re-assemble (Mechanical).
- Re-assemble (Electrical). Update to Latest Specifications in Design and Safety.
Use Old Products if Applicable.
- Test and Calibrate.
- Mask and Prepare for Final Spray.
- Final Spray.
- De-mask and Fit Labels etc.
- Machine to be Guaranteed for 12 Months.
|